Level the floor

Attention:
If the floor is not leveled, the sound insulation of the pod will be improper. Level the floor before moving forward in the installation. Check the level also after the installation.
Note:
If the pod is equipped with the optional casters and moved after assembly, the pod must be re-leveled.

  1. Lay the floor down at the intended installation site.

  2. Note:
    After you have leveled the floor, stand on it to make sure that it is stable.