Reinstall the table (2Q Standard)
-
Install the table to the angle irons in the power column with 5x25 screws (2
pcs).
-
Connect power outlet cord to the GST extension cord.
-
Guide the HDMI cord up through the hole below the table and pull it out through
the hole above the control panel.
Note: Removing the grommet from the front profile makes guiding the HDMI cord into the profile easier.
-
Connect the optional LAN cords to the power socket.
-
Guide the cords into the cord duct and install the cord duct cover.