Critical installation steps
FLOOR Make sure that the floor board with a recess is placed where the door will be.
Why? If done incorrectly, the assembly time for this phase will double.
ELECTRICS Make sure that all connectors are securely attached and that the cables do not cover the core unit.
Why? If done incorrectly, the pod does not work.
FRONT GLASSES Make sure to check the straightness with a spirit level as instructed.
Why? If the straightness is not checked, there is a risk that the door does not close properly.
FRAMES Make sure that the bolts are tightened to correct torque (20 Nm / 14.75 ft-lbs).
Why? Loose bolts will lead to insufficient sound insulation and to an unusable product.
EXTERIOR WALL PANELS Make sure that the exterior wall panels are bolted together firmly and in the order shown in the instructions.
Why? If done incorrectly, it affects the overall visual quality and soundproofing of the pod.