Connect the electrical connections in the roof
-
Install the light with control hub.
The light with control hub attaches to the ceiling with magnets.
-
Connect the long CAN cord to the control hub.
-
Connect the fan cords to the control hub.
-
If the power cord is installed to the roof module, connect the power cord to
the extension cord.
Figure 1. * = Optional LAN cord -
Guide the wire of the wired device through the strain relief and reinstall
it.
Note: If the power cord is installed to the roof module, guide the power cord through the strain relief.
-
Install the occupancy indicator lights to the back of the pod.