Connect the electrical connections in the roof

  1. Install the light with control hub.
    The light with control hub attaches to the ceiling with magnets.
  2. Connect the long CAN cord to the control hub.
  3. Connect the fan cords to the control hub.
  4. If the power cord is installed to the roof module, connect the power cord to the extension cord.
    Figure 1. * = Optional LAN cord
  5. Guide the wire of the wired device through the strain relief and reinstall it.
    Note: If the power cord is installed to the roof module, guide the power cord through the strain relief.
  6. Install the occupancy indicator lights to the back of the pod.