Required space with seismic anchoring

When the pod is installed in a tight space or several pods are installed tightly next to each other, the required space on both sides of the template is at least 5 mm (0.2 in) and 10 mm (0.4 in) on the backside of the template.
Note:
In this case the pod electrics cannot be accessed after installation. The functionality of pod electrics must be checked before the pod is pushed to the final location.
Figure 1. Required operating space with seismic anchoring (tight installation).

If space is not limited, the recommended space on the techwall side of the pod is at least 50 cm (20 in). This is to ensure that all electrical components of the pod can be accessed for maintenance or replacement purposes.

Figure 2. Required operating space with seismic anchoring.